HOMECONTACTCITY HALLCITY EMPLOYMENTONLINE SERVICEBUSINESSRESIDENTSVISITORS
City of KnoxvilleContact Us
I Want To...
Download Permits & Forms »
Find City Court Info »
Find Next Brush Pickup Date »
Report Traffic Issue »
Retrieve Impounded Vehicle »
News
Knoxville Advances in $5 Million Energy Prize Competition »
Public Meeting Set for Aug. 21 Regarding City Park at Summit Hill/Gay St. »
Fountain City Lake Repairs Coming Soon »
KUB Construction to Close South Central Street for 2 Months »
Downtown Circulation and Mobility Plan »
Mobile Food Vendor Program »
Civil Rights Act Anniversary »
Cumberland Connection Blog »
Engineering Department Project Blog »
Like the City on Facebook® »
Follow the City on Twitter »
View Press Releases »
Click Here for Printer Friendly Version
REQUIRED SIGNATURE STAMPS & NOTES FOR SURVEY PLATS
Engineering Department
Civil Engineering Division
Stormwater Engineering Division
Traffic Engineering Division
City of Knoxville
Engineering Department
Stormwater Engineering Division


The following are standard stamps and notes that may be on survey plats submitted to the Metropolitan Planning Commission (MPC) for recording certification. These stamps are those of particular interest to City Engineering. The "City of Knoxville Engineering Department" stamp must be included on all plats within the City of Knoxville. The other stamps and notes must be included depending on the requirements for each individual plat.

Please refer to the Knoxville-Knox County Metropolitan Planning Commission Minimum Subdivision Regulations and the City of Knoxville Land Development Manual and Stormwater and Street Ordinance for further guidance concerning the following stamps.


REQUIRED STAMPS

#1

City of Knoxville Engineering Department
The Knoxville Engineering Department hereby approves this plat on this the___________day of ________________________, 20___

____________________________________
Engineering Director

#2

Guarantee of Completion of Drainage Systems
I, the undersigned, hereby certify bond or other security has been posted with the appropriate agency to insure completion and stabilization of all drainage systems as shown on drainage plans which were approved the ______day of __________, 20____, within a period not to exceed one year from date of approval.

Signed:_______________________________ Date:___________________

Dept:_________________________________ Title:___________________

#3

Guarantee of Completion of Streets and Related Improvements
I, the undersigned, hereby certify bond or other security has been posted with the appropriate agency to insure completion of all streets and related improvements including indicated permanent reference monuments, benchmarks and iron pins in this subdivision in accordance with required standards and specifications with a period not to exceed one year from date of approval of the Final Plat.

Signed:_______________________________ Date:___________________

Dept:_________________________________ Title:___________________

#4

Special Pollution Abatement Permit
I, the undersigned, hereby certify that the stormwater quality facilities shown
on this plat have been approved by Special Pollution Abatement Permit
No. __________, approved by the City of Knoxville's Department of
Engineering on the _______ day of _______________________, 20____.

Signed:_______________________________ Date:___________________

Dept:_________________________________ Title:___________________

#5

City – Release of Easements
Except as noted or shown on this plat, the following parties hereby consent to the release of all rights that may have accrued for their use and benefit in the utility and drainage easements along the original lot lines eliminated by this map, on the condition that new utility and drainage easements are provided along the new property lines.
City of Knoxville Engineering Department
Signed:____________________ Date:___________________

Knoxville Utilities Board (Water & Wastewater)
Signed:____________________ Date:____________________

Knoxville Utilities Board (Gas)
Signed:____________________ Date:____________________

Knoxville Utilities Board (Electric)
Signed:____________________ Date:____________________

BellSouth
Signed:____________________ Date:____________________

Cable Television
Signed:____________________ Date:____________________

#6

No easements to release: RLS certification
This is to certify that there are not recorded drainage easements or utility easements on lot line(s) being eliminated on this Subdivision plat.

Date: ___________ Signature: ______________________________

ADDITIONAL NOTES

A

Owner’s Responsibility Note
The property owner(s) is (are) responsible for maintaining stormwater facilities on this property. See Covenants document recorded with the Register of Deeds as Instrument No. _________________________.

B

Subdivision and Transfer of Property Only Note
This plat is approved for the subdivision and transfer of property only. Another plat may be required if new stormwater quantity and/or water quality facilities are needed for future development.

C

Property Boundary Encroachment Note
This survey indicates one or more property boundary encroachments. It has not been addressed by plat reviewing agencies. Owners are responsible for resolving property boundary conflicts.

D

Grid North Statement
GRID NORTH is based on a bearing of X Degº Min' Sec" Y from City Control Point #_____ to #_____. Distances have not been reduced to grid.

Example:
GRID NORTH is based on a bearing of N 59º 07' 35" E from City Control Point # 0317 to # 0309. Distances have not been reduced to grid.

WEB LINKS

Plat Review Checklist [PDF]

Land Development Manual

City of Knoxville Stormwater and Street Ordinance [PDF]

Knoxville-Knox County Metropolitan Planning Commission (MPC)


 
Add to Favorites
Adobe PDF Reader
Email Page
Font Smaller
Font Normal
Font Larger
Get Directions
Make Home Page
Print Page
RSS/XML Feed
Search A to Z List
Site Map
Traduzca en Español
Translate to More Languages
Dial 3-1-1 For City Services
311. One Number. One Call.
Click Here for Brush Pickup Schedule
City Departments
Communications »
Community Development »
Community Relations »
Engineering »
Finance Dept. »
Fire Dept. »
Law Dept. »
Mayor's Office »
Parks & Recreation »
Plans Review/Inspections »
Police Dept. »
Policy & Redevelopment »
Public Service »
Special Events »
Sustainability »
List of All Depts. »
Phone List »
Promotions