HOMECONTACTCITY HALLCITY EMPLOYMENTONLINE SERVICEBUSINESSRESIDENTSVISITORS
City of KnoxvilleContact Us
I Want To...
Download Permits & Forms »
Find City Court Info »
Find Next Brush Pickup Date »
Report Traffic Issue »
Retrieve Impounded Vehicle »
News
Mayor's Walking Tour in Edgewood Park Neighborhood »
President Bush Appoints Mayor to Historic Preservation Advisory Council »
Bocangel Named Mentoring Program Coordinator for Compassion Coalition »
City Taking Applications for Mayor's U.T. Student Advisory Board »
List of Vehicles for Public Vehicle Auction Sept. 15 - PDF »
Chilhowee Park Steam Engine Moving Across Town »
2008 Lineup Announced for Movies on the Town »
TN Valley Fair Sept. 5-14 »
East TN Historical Society Presents New Signature Exhibit »
Cumberland Avenue Corridor Project »
Downtown North/I-275 Redevelopment »
SmartFIX40 Update »
View Press Releases »
Click Here for Printer Friendly Version
REQUIRED STAMPS FOR AS-BUILT DRAWINGS
Engineering Department
Civil Engineering Division
Stormwater Engineering Division
Traffic Engineering Division
City of Knoxville
Engineering Department
Stormwater Engineering Division


An approved development certification is one of the items required proir to the release of any bond (also called Performance and Indeminity Agreement) that has been required by the Stormwater Engineering Division. An intrugal part of the development certification is an as-built drawing submitted by the design engineer. The as-built must have the signed license stamps of both the engineer and the surveyor. In addition, the following certification stamps need to be on the drawing with the appropriate information shown.



ENGINEER CERTIFICATION STAMP:

I, _________________________________, (PE #) hereby certify
that I am an Engineer licensed in the state of Tennessee. I have
reviewed the information based on the survey dated_________,
provided to me by________________, a state of Tennessee land
surveyor registration number______________.

Based on the aforementioned survey and to the best of my knowledge,
information and belief, the development was constructed such that the
infrastructure improvements shown hereon function as intended on
the approved design titled ___________________________________
permitted on the _____day of___________20____.

Signature: ___________________________________
Printed Name: _______________________________
Date: ________________

 

SURVEYOR CERTIFICATION STAMP:

I hereby certify that I have surveyed the land boundaries and
easements shown hereon in accordance with the accuracy
requirements for a Category I survey and that the ratio of
precision of the unadjusted survey is not less that 1:10,000.

I further certify that I have located all natural and manmade
features shown hereon in accordance with the current
Standards of Practice adopted by the Tennessee State Board
of Examiners for Land Surveyors. I certify the location,
elevation, and description of these features.

Signature: ___________________________________
Printed Name: _______________________________
Date: ________________

 

WEB LINKS

Site Inspection Checklist [PDF]

Development Certification Checklist [PDF]

Land Development Manual

City of Knoxville Stormwater and Street Ordinance [PDF]


Add to Favorites
Adobe PDF Reader
Email Page
Font Smaller
Font Normal
Font Larger
Get Directions
Google Search
Make Home Page
Print Page
RSS/XML Feed
Search A to Z List
Site Map
Traduzca en Español
Translate to More Languages

5 DAY FORECAST »
Dial 3-1-1 For City Services
311. One Number. One Call.
Click Here for Brush Pickup Schedule
City Departments
Community Relations »
Finance Department »
Fire Department »
Law Department »
Mayor's Office »
Operations & Efficiency »
Policy & Communications »
Police Department »
Public Works »
Special Events »
South Waterfront »
List of All Depts. »
Phone List »
Promotions